Published · 9 min read
Short answer: In New York City, most contractor decisions in a co-op or condo start with the building, not the apartment. Facades, roofs, risers and boilers are usually the corporation’s or the condominium’s job, and two city laws — the facade inspection program known as Local Law 11 and the building emissions limits of Local Law 97 — drive much of that spending. Inside your apartment, you can usually hire your own electrician, plumber or painter, but only after the board signs off, and only with a contractor who holds the right city license.
Last reviewed: 19 November 2026 (Europe/Helsinki). Figures and legal citations were checked against the sources listed below. They can change. This is general information for US condo, co-op and HOA owners, not legal, insurance or contracting advice. Your proprietary lease, house rules, declaration and local law decide who may do the work and who pays for it.
Some links in this article are affiliate links. If you click one and request a quote or hire a pro, we may earn a commission at no extra cost to you. See our affiliate disclosure.
Co-op or condo: who you ask before you hire
New York is unusual because so many apartments are co-ops rather than condominiums. In a co-op, the New York Attorney General explains, a purchaser buys shares in a corporation, the shares are allocated to a specific apartment, and owning them entitles the purchaser to a long-term proprietary lease (NY Attorney General, Cooperatives). The corporation owns the building, so the board’s consent is the gate for almost any renovation, and the proprietary lease, house rules and the building’s alteration agreement set the terms.
Courts give boards a lot of room. In Levandusky v. One Fifth Avenue Apartment Corp., decided by the New York Court of Appeals in 1990, a shareholder had moved a steam riser while enlarging his kitchen and the board issued a stop work order; the court held that a standard analogous to the business judgment rule applies to co-op boards enforcing building policy. In practice, a board that acts in good faith, within its authority and for the building’s purposes can set strict rules for contractors, insurance, work hours and plans, and those rules are hard to challenge. Read the alteration agreement before you collect bids so that every bidder prices the same requirements.
Condominium owners in New York own their units outright, but the declaration and bylaws still decide what is a common element and which changes need board approval. Either way, the first question is the same as elsewhere in the country: whose component is it? Our glossary explains the terms, and our guide to special assessments covers what happens when the building has to pay for a large project.
Local Law 11: the facade cycle every tall building runs on
The city’s Facade Inspection and Safety Program (FISP), widely known as Local Law 11, applies to properties higher than six stories. Owners must have exterior walls and appurtenances inspected every five years and file a technical facade report with the Department of Buildings, and they must repair unsafe conditions within 90 days of filing (NYC DOB, Facade & Local Law). The inspection must be done by a Qualified Exterior Wall Inspector, who must be a New York State licensed professional engineer or registered architect, and each facade is classified as safe, safe with a repair and maintenance program, or unsafe. An unsafe classification means the owner must immediately install public protection, such as a sidewalk shed.
The current round is Cycle 10, which the Department splits into sub-cycles by the last digit of the block number. Filing windows run from 21 February 2025 to 21 February 2027 for blocks ending in 4, 5, 6 or 9; from 21 February 2026 to 21 February 2028 for blocks ending in 0, 7 or 8; and from 21 February 2027 to 21 February 2029 for blocks ending in 1, 2 or 3 (DOB Cycle 10 service notice). For an owner, the report matters because it lists the repairs the building will have to make in the next few years. Ask the managing agent for the latest filing before you vote on a budget, and before you plan exterior work such as new windows or a terrace railing, which may have to be coordinated with the facade contractor.
Local Law 97: emissions limits and the boiler question
Local Law 97 of 2019 is the second law that shapes contractor work in large buildings. Most buildings over 25,000 square feet must meet greenhouse gas emissions limits that began in 2024, with stricter limits from 2030, and the stated goal is to cut emissions from the city’s largest buildings 40 percent by 2030 and to net zero by 2050 (NYC DOB, LL97). Covered buildings under Article 320 had to file their first emissions report by 1 May 2025 and must file by 1 May every year after that, certified by a registered design professional. From 2026, all owners must report against limits based on Energy Star Portfolio Manager property types (DOB, LL97 emissions limits).
For a co-op or condo board, that turns heating plants, controls, insulation and electrical capacity into planning questions rather than emergency repairs. For an owner, it is a reason to ask before replacing a through-wall air conditioner, adding a heat pump or upgrading an apartment panel: the building may have an electrification plan, a preferred contractor or limits on the load each apartment can add. Our guides to hiring an HVAC contractor and hiring an electrician in an HOA or condo cover the approval questions in more detail.
The trades owners hire inside the apartment
New York has the country’s largest workforce in the trades most apartment owners hire. In the May 2025 Occupational Employment and Wage Statistics, the New York-Newark-Jersey City metro had 36,550 electricians, 21,040 plumbers and pipefitters and 21,820 heating, air conditioning and refrigeration mechanics, first among US metros in each, and 11,930 painters, second only to Los Angeles, as compiled by Where America Hires from Bureau of Labor Statistics data (electricians, plumbers, HVAC mechanics, painters).
Electrical work is the clearest example of why licenses matter here. The Department of Buildings says an electrical permit is required for most electrical work, including handling wires in a residential home, and that permits are issued for installations that must be performed by electrical contractors licensed by the Department (DOB, Electrical Permit). A Master Electrician is licensed to perform electrical work as an independent contractor in any building in the city (DOB, Master Electricians). When the work is yours and the board has approved the plans, you can compare quotes from top-rated electricians and then check each bidder’s license number in the DOB’s public portal.
Plumbing follows the same pattern: Master Plumbers are licensed by the Department of Buildings, and the DOB’s Know Your Construction Professional page links to lists of licensed master electricians and master plumbers and a license search with disciplinary records. In most buildings, risers and the main lines are the building’s, while fixtures and the branch lines that serve only your apartment are often yours; your lease or declaration decides. If a leak or a bathroom renovation is your responsibility, you can compare quotes from top-rated plumbers — our plumber guide explains how to split leak costs with the building.
Painting needs no DOB trade license, but a painting firm doing home improvement work still needs the DCWP license described below. In the 2023 Houzz & Home Study, summarized in a 2024 Houzz metro analysis, only 19 percent of renovating New York homeowners updated exterior paint, against 27 percent nationally, so most painting here is interior. In pre-1978 buildings, the federal Renovation, Repair and Painting Rule applies to many paint-disturbing jobs; ask whether the firm is EPA lead-safe certified before you Compare quotes for Painting. Our guide to hiring a painter in an HOA or condo covers the approvals.
The country’s biggest home improvement market
According to Table A-3 of the Harvard Joint Center for Housing Studies’ Improving America’s Housing 2025 data tables, based on the 2023 American Housing Survey, homeowners in the New York metro spent $25.08 billion on improvements, the most of any metro in the survey. About 1.05 million of roughly 4.09 million owners reported a project, and average spending was $6,127 per owner, against $4,663 nationally. Replacement projects — roofs, windows, flooring and home systems — were 50.2 percent of spending; professionals did 90.2 percent of the work; and projects of $50,000 or more accounted for 59.0 percent of spending, against 44.1 percent nationally.
Those totals include houses in the suburbs as well as city apartments, but the association sector is large too. The Foundation for Community Association Research’s 2025 Statistical Review estimates 14,600 community associations in New York State — a term that, in its definition, includes condominiums, cooperatives and planned communities — with about 3.50 million residents.
Licenses, permits and the home improvement contract
Beyond the DOB trade licenses, New York City requires a separate license for general renovation work. The Department of Consumer and Worker Protection says a person or business must have a Home Improvement Contractor license to do construction, repair, remodeling or other home improvement work to any residential land or building in the city (DCWP, Home Improvement Contractor). To get one, a business must either enroll in the city’s Home Improvement Business Trust Fund, which costs $200, or post a $20,000 surety bond, and one principal must pass the home improvement exam. DCWP publishes sample estimate, contract, permit disclosure and change order forms, and it lets anyone check a license online.
The same DCWP page notes that many home improvements require a DOB permit and that sidewalk work requires a permit from the Department of Transportation. The DOB advises that a written contract with a tradesperson should include the company name, a New York City business address and license numbers. In a co-op or condo, the alteration agreement will usually add the building’s own conditions, such as insurance certificates naming the corporation, a deposit, approved work hours and plans reviewed by the building’s architect or engineer.
A short hiring checklist
- Read the proprietary lease or declaration and house rules. If the component is the building’s — facade, riser, roof, boiler — take it to the board or managing agent.
- Get the alteration agreement and the building’s insurance requirements before you request bids.
- Ask for the latest FISP report and the building’s Local Law 97 plan if your work touches windows, terraces, heating, cooling or electrical capacity.
- Verify the DCWP Home Improvement Contractor license for general work, and the DOB license for electricians and plumbers.
- Agree in writing who files the DOB permit, and confirm the permit is issued before work starts.
- For pre-1978 buildings, ask for EPA lead-safe certification on any job that disturbs paint.
- Collect insurance certificates naming the building, and keep the board’s written approval with the contract.
Can I hire my own contractor in a New York co-op?
Usually yes for work inside your apartment, but only with the board’s written consent under the proprietary lease and the building’s alteration agreement. Under Levandusky v. One Fifth Avenue Apartment Corp. (1990), courts apply a standard analogous to the business judgment rule to co-op boards enforcing building policy, so the board’s conditions on plans, insurance and work hours are hard to challenge.
What is Local Law 11?
It is the common name for the city’s Facade Inspection and Safety Program. Owners of buildings higher than six stories must have the facade and appurtenances inspected every five years by a Qualified Exterior Wall Inspector and file a report with the Department of Buildings, and they must repair unsafe conditions within 90 days of filing. Cycle 10 filing windows run from February 2025 to February 2029, depending on the last digit of the block number.
Does Local Law 97 affect my apartment renovation?
Directly, it applies to the building, not to individual apartments: most buildings over 25,000 square feet must meet emissions limits that began in 2024 and tighten in 2030. Indirectly, it can affect what you may install, so ask the board about its electrification plan before replacing air conditioners, adding a heat pump or upgrading your panel.
What license does a New York City contractor need?
General home improvement contractors need a Home Improvement Contractor license from the Department of Consumer and Worker Protection. Electrical and plumbing work must be done by contractors licensed by the Department of Buildings, such as a Master Electrician or Master Plumber, and most electrical work needs a DOB permit.




